Fittings&Hose Installation:

  1. Release the hose clamp assembly by releasing the thumbscrews, slide the socket nut holder open.
  2. Slide the cover back and slide the socket nut insert into the tool and the hose clamp insert into the holder.
  3. Place the socket nut into the tool holder and the hose into the hose clamp, place the nut into the nut clamping mechanism and slide the cover closed.
  4. Place the stainless steel braided hose into the hose clamping mechanism and tighten the two screws to hold it in place.
  5. With the cover closed and the hose held in place begin rotating the wheel until it can’t rotate any further, measure depth of nut to prevent over-threading.
  6. To transform the BJR Hose Installation Kit from an installation tool to a vice simply slide the hose clamp and handwheel assembly off the base.
  7. Unscrew the socket nut holder and screw on the vice adapter.
  8. Slide the two vice-jaw piece onto the base of the assembly, slide the handwheel assembly our and aslide back into the groove of the vice piece.
  9. The BJR Hose Installation Kit has now been adapterd to be use of BJR’s alloy shifter eliminates the possibility of marking the fittings.